If access is refused
A workable compromise is a visual assessment before exchange and a full EICR immediately after completion, when the property is empty and testing is straightforward.
A home buyer electrical inspection tells you the condition of a property’s fixed installation before you commit. A valuation survey does not test the electrics; it usually recommends that someone does. An inspection establishes what is actually present, what needs work, and how that sits against the price being discussed.
A general property survey does not always provide a detailed view of the electrical installation. A buyer should explain the transaction stage, property type, access arrangements, timescale and the questions they need the electrical inspection to address. Big Volt Electric can then confirm whether an EICR or another defined inspection scope is appropriate.
Provide the property type, postcode and stage of the purchase.
Share relevant survey extracts or existing electrical reports.
Access, scope, timing and report expectations are confirmed.
Any follow-on investigation or remedial quotation is treated as a separate step.
Surveyors routinely recommend a specialist electrical inspection because a general survey does not include any testing. The recommendation is not a diagnosis — it means the condition is unknown. An inspection turns that unknown into a costed list, which is useful whether you proceed, renegotiate, or simply budget for the work after completion.
Timing is the practical difficulty. Before exchange is more useful because findings can affect the price, but it needs the vendor to agree to access and to the power being switched off during testing, which is not always given in an occupied house.
A workable compromise is a visual assessment before exchange and a full EICR immediately after completion, when the property is empty and testing is straightforward.
A modern consumer unit, RCD protection, main bonding to gas and water, adequate sockets, and modern cable colours at the board. Rewireable fuses, round-pin sockets, black rubber cable or no earth at light switches all point to significant work.
Conveyancers ask for certificates covering notifiable work since 2005 — a consumer unit change, a new circuit, a rewire. Where they are missing the routes are a retrospective inspection, regularisation through building control, or an indemnity policy.
A new build should come with an Electrical Installation Certificate and Building Regulations paperwork from the developer. Ask for those first; you are entitled to them.
Include the postcode, preferred timing and any useful existing information.