Extension and Renovation Electrics

Renovation electrical work is most effective when layouts, equipment, other trades and decision dates are coordinated before the walls and finishes close. Share the architectural drawings, room plans, appliance information and project programme so the electrical scope can be developed alongside the build.

When to enquire

This service may be relevant for

  • Rear, side or loft extension projects
  • Whole-floor or multi-room residential renovations
  • Projects requiring new circuits and changed electrical layouts
  • Builders or homeowners coordinating first-fix and second-fix work

Define the scope

Points to confirm in writing

  • Review of drawings, room use and equipment schedules
  • Planning of outlets, lighting, controls and circuit requirements
  • Coordination with the main construction programme and other trades
  • A written staged scope with assumptions, exclusions and change control

Enquiry process

A practical route to an agreed job

  1. 01

    Share the current drawings, programme and decision-maker details.

  2. 02

    Electrical requirements are reviewed room by room.

  3. 03

    Open design decisions and coordination points are recorded before quotation.

  4. 04

    Installation stages and the process for changes are agreed with the project team.

Coordinating with the build

Why the electrician should be involved before the walls go up

Socket positions, switch positions, lighting design, appliance loads and the capacity of the existing supply all influence what an extension can do, and all are cheap to change on a drawing and expensive to change in plaster. Involving an electrician while the layout is still being decided is the single highest-value thing you can do.

The work also has to be sequenced around other trades. First fix happens while the structure is open; second fix happens after plastering and decoration. That means two visits separated by weeks, planned against the builder programme rather than booked as one continuous job.

Supply capacity

An extension that adds an induction hob, underfloor heating, a car charger or a heat pump may exceed what the existing supply was sized for. The main fuse rating, tails, board capacity and diversity calculation all feed into it. A genuine supply upgrade takes time to arrange, so identify it early.

Loft conversions

A conversion usually makes the house three storeys, which brings fire safety requirements for the escape route including interlinked mains-powered alarms. Agree the alarm grade and category with building control at design stage.

Notification

New circuits are notifiable under Part P. Where the work is certified through a competent person scheme you receive a Building Regulations compliance certificate; otherwise it must be notified to building control in advance.

Making good

Establish in writing what is included. Patching chases is normally distinct from replastering, and decorating is usually excluded from electrical work.

Questions about renovation electrics

Drawings are a valuable starting point, but an electrical schedule and product information may still be required. Any discrepancies should be resolved before installation positions are fixed.